The Making of ML: Check-In 1

Behind the scenes

Published on:
Jul 2021

The Making of ML: Check-In 1

One notion that I hold close to my work is that the journey is sometimes as important, if not more important, than the destination. To zoom in closer to what we do and not to sound too philosophical, the progress when designing and renovating ahouse is sometimes as important as the final finished result.


That means we always try to have a good rapport with whomever we work with by having excellent customer service and keeping home owners informed of the design progress, issues (yes, issues) and progress at site. We don't crave for that "tadaaaa!" moments as many artists do.


To uphold this ideal and principle, we will now be trying to post on-going projects ona weekly basis and document as much as possible, because I believe there is something we or you can learn from, every step of the way and on the way to turn a house into a home.

No items found.
________________________

The cast

No items found.

Project: Monet Lily Residence @ Sunsuria City, Sepang.

House: 2-Storey intermediate terrace

Notable works: Extension of kitchen and guest room at the rear of the house.

Client brief: House to be used as short-term rental, but also as occasional weekend home.

The design

No items found.
Extension of the Kitchen allowed living room to expand too

Feature wall to partially cover staircase and store room door

Sliding & hide glass door to kitchen, allowing more natural light to enter dining space

Extended kitchen with new floor tiles

Family area on 1st storey

Master bedroom with feature headboard

Long wardrobe with a dresser tucked in the corner

Bedroom 1 with headboard come-shelf to replace side table

Bedroom 2 with side table/ dresser combination

Bedroom 2 wardrobe area

The progress

No items found.

As we get into the final week of CMCO, it was good to get the work going, starting with extension of existing kitchen and guest room as well as electrical. We are usually quite methodical and move through stages/ scope of works in an organised fashion. However, since there are no wet works going on on the 1st storey, we allowed electrical works to commence to shorten the overall renovation time.

Minor excavation works completed, allowing foundation (footing) to be casted.


Family area mirror/ feature wall.


Detailed look into feature wall @ Family.


Master Bedroom electrical works completed. Lighting point placed above existing ceiling,  opening for light fittings to be done when ceiling works for other areas commence.


Bedroom 1 electrical works completed.


Headboard for Bedroom 2.


Bedroom 2 electrical works completed.

Dresser mirror for Bedroom 2.

Sidetable/ dresser for Bedroom 2.

No items found.

No items found.

No items found.

No items found.

No items found.
____________________________

Apart from building up the habit of documentation, this type of post is meant to help readers. Do leave a comment on information you'd like to know more of or types of post you would like to see more.

Nick

Other posts

Issues when establishing renovation budget based on percentage of property price.

Category:
Renovation
Issues when establishing renovation budget based on percentage of property price.

3 Mindset Shifts with Design and Home Renovation In This Digital Age

Category:
Design
3 Mindset Shifts with Design and Home Renovation In This Digital Age

The Making of ML: Check-In 4

Category:
Behind the scenes
The Making of ML: Check-In 4

8 ways you know you're In a millennial's home

Category:
Design
8 ways you know you're In a millennial's home